Section 202.6 Amended ID #2012-006R

Key Dates

May 17, 2024 | Comments due on proposed amendments to ID #2012-006R

April 26, 2024 | Materials posted for proposed amendments to ID #2012-006R

Purpose

Section 202.6 of the ISO rules, Adequacy of Supply requires the AESO to publish details of the calculations and methodologies underlying the forecasts and reports referenced in subsections 2, 3, and 4.2 of Section 202.6.

The AESO is proposing amendments to ID #2012-006R to amend some of the variables and assumptions used in the methodology set out in Appendix 3 of ID #2012-006R, Calculations and Methodologies regarding Supply Adequacy. These will make the short-term adequacy metric more accurate and provide a better indication of reliability.

Key Dates

May 17, 2024 | Comments due on proposed amendments to ID #2012-006R

April 26, 2024 | Materials posted for proposed amendments to ID #2012-006R

Purpose

Section 202.6 of the ISO rules, Adequacy of Supply requires the AESO to publish details of the calculations and methodologies underlying the forecasts and reports referenced in subsections 2, 3, and 4.2 of Section 202.6.

The AESO is proposing amendments to ID #2012-006R to amend some of the variables and assumptions used in the methodology set out in Appendix 3 of ID #2012-006R, Calculations and Methodologies regarding Supply Adequacy. These will make the short-term adequacy metric more accurate and provide a better indication of reliability.

  • CLOSED: This survey has concluded.

    The AESO is seeking Stakeholder feedback on Appendix 3 and the removal of the exclusion of wind and solar generation from the detailed calculations and methodologies relating to long-term adequacy of supply contained in Information Document #2012-006R, Adequacy, Supply Shortfall and Energy Emergency Alerts ("Amended ID 2012-006R").

    Instructions

    1. To submit your responses, you will need to be registered and signed in on the AESO Engage platform.
    2. Please click on the "Submit Stakeholder Feedback" box below to begin the survey and provide your specific comments.
    3. Please submit one completed survey per organization.
    4. All responses will be shared on AESO Engage.
    5. Responses are due on or before January 24, 2023.

    Stakeholder Question:

    1. Do you have comments on Appendix 3 of Amended ID #2012-006R?
    Submit Stakeholder Feedback
Page last updated: 26 Apr 2024, 03:29 PM