Grid Reliability Update

Purpose

The AESO has expanded the scope of the previously named "Transmission System Projects Update" to provide stakeholders with more information on technically oriented topics which include transmission system projects as well as a Reliability Requirements Roadmap update.

Details for the 2023 session are provided below.

Purpose

The AESO has expanded the scope of the previously named "Transmission System Projects Update" to provide stakeholders with more information on technically oriented topics which include transmission system projects as well as a Reliability Requirements Roadmap update.

Details for the 2023 session are provided below.

  • 2023 Information Session | Nov. 23, 2023

    This session has concluded.

    On November 23, 2023, the AESO held its virtual Grid Reliability update from 9 a.m. to 12 p.m.

    Purpose

    The purpose of this session was to provide an update on key transmission system projects, an update on initiatives associated with Reliability Requirement Roadmap, and other system level AESO initiatives.

    • Session objectives
      • Provide updates on the status of major transmission projects, including potential filing and triggering of the projects
      • Provide update on the Long Term Transmission Plan delivery date and the rationale
      • Create awareness of current challenges on the transmission system as it continues to evolve

    Materials

    Are available under AESO Materials on the right-hand side of this page.

  • 2022 Information Session | Oct. 20, 2022

    CLOSED: This session has concluded.

    Session purpose

    To provide an update and details on the following key transmission system projects in Alberta:

    • Recap of transmission capital investments outlined in 2022 LTP
    • CETO and PENV updates
    • South area transmission developments
      • Vauxhall area transmission development
      • Voltage support at Bowmanton
      • 240 kV southeast development and update on risks of a double circuit contingency
      • 853L Upgrade
      • Stavely area transmission development
    • City of Edmonton transmission reinforcement
    • Power flow control pilot project
    • CRPC and intertie restoration update
    • Updated capital investments and rate impact

    Materials

    Can be found in the Materials section on the right-hand side of the page.

    Dec 8, 2022 Update to materials:

    Following the virtual Oct. 20th, 2022, Transmission System Projects Overview information session, the AESO identified two charts showing Transmission Rate Projection (TRP) information weren’t reflecting the latest information. Charts shown on slide 13 and slide 37 were prepared using older TRP information. We have since updated the charts with the latest TRP information, and the new charts are now included in the updated presentation found in the Materials section on the right-hand side of the page.

  • 2021 Information Session | Oct. 27, 2021

    CLOSED: This session has concluded.

    The AESO hosted a virtual information session on Oct. 27, 2021 to provide awareness and understanding on the status of key transmission system projects.

    Session purpose

    To provide an update and details on the following key transmission system projects in Alberta:

    • Provost to Edgerton and Nilrem to Vermilion Transmission Development (PENV)
    • Central East Transfer-out Transmission Development (CETO)
    • Emerging need for transmission development in Southeast Alberta
    • Chapel Rock-to-Pincher Creek Transmission Development (CRPC)
    • AB-BC Intertie Restoration
    • Upcoming transmission reinforcement in the City of Edmonton

    Materials

    Can be found in the Materials section on the right-hand side of the page.

Page last updated: 13 Apr 2024, 10:01 PM